![]() |
![]() |
|
|
Welcome to the SuperiorMuscle.com - Bodybuilding Forums. You are currently viewing our boards as a guest which gives you limited access to view most discussions and access our other features. By joining our free community you will have access to post topics, communicate privately with other members (PM), respond to polls, upload content and access many other special features. Registration is fast, simple and absolutely free so please, join our community today! If you have any problems with the registration process or your account login, please contact us. |
|
|||||||
![]() |
|
|
Thread Tools |
|
#1
|
||||
|
||||
|
Engineering Question Problem
Engineering Question Problem
A Backhoe weighing 8 tons is on top of a flatbed trailer and heading east on Interstate 70 near Hays, Kansas. The extended shovel arm is made of hardened refined steel and the approaching overpass is made of commercial-grade concrete, reinforced with 1 ½ inch steel rebar spaced at 6 inch intervals in a criss-cross pattern layered at 1 foot vertical spacing. Solve: When the shovel arm hits the overpass, how fast do you have to be going to slice the bridge in half? (Assume no effect for headwind and no breaking by the driver...) Extra points: Solve for the time and distance required for the entire rig to come to a complete stop after hitting the overpass at the speed calculated above. Now look at the attached pictures. ![]() ![]() ![]() |
| Sponsored Links |
|
#2
|
|||
|
|||
|
that is out of control
|
![]() |
| Thread Tools | |
|
|