Engineering Question Problem
A Backhoe weighing 8 tons is on top of a flatbed trailer and heading
east on Interstate 70 near Hays, Kansas. The extended shovel arm is
made of hardened refined steel and the approaching overpass is made of
commercial-grade concrete, reinforced with 1 ½ inch steel rebar spaced
at 6 inch intervals in a criss-cross pattern layered at 1 foot vertical
spacing.
Solve: When the shovel arm hits the overpass, how fast do you have to
be going to slice the bridge in half? (Assume no effect for headwind
and no breaking by the driver...)
Extra points: Solve for the time and distance required for the entire
rig to come to a complete stop after hitting the overpass at the speed
calculated above.
Now look at the attached pictures.


A Backhoe weighing 8 tons is on top of a flatbed trailer and heading
east on Interstate 70 near Hays, Kansas. The extended shovel arm is
made of hardened refined steel and the approaching overpass is made of
commercial-grade concrete, reinforced with 1 ½ inch steel rebar spaced
at 6 inch intervals in a criss-cross pattern layered at 1 foot vertical
spacing.
Solve: When the shovel arm hits the overpass, how fast do you have to
be going to slice the bridge in half? (Assume no effect for headwind
and no breaking by the driver...)
Extra points: Solve for the time and distance required for the entire
rig to come to a complete stop after hitting the overpass at the speed
calculated above.
Now look at the attached pictures.



Comment